Mayor of Limerick John Moran's Budget Speech 2027

More Delivery through reform.

A Phríomh-Chomhairleoir, a chomhairleoirí, a Ard-Stiúrthóir, a fhoireann, agus a mhuintir Luimnigh-

Is mór an onóir dom buiséad na bliana seo chugainn a chur faoi bhur mbráid inniu. Tá dúshláin romhainn, ach tá Luimneach ag fás, agus tá muinín agam as ár gcathair agus as ár gcontae. (“Príomh Comhairleor, councillors, Director General, staff, and people of Limerick. It is a great honour to put next year's budget before you today. There are challenges ahead, but Limerick is growing, and I have confidence in our city and our county.”)

When we sat here last November, the surpluses that had helped us through budget decisions in previous years had run out. Without additional income, the Council faced substantial shortfalls in its day-to-day budget. We agreed to raise rates by 6% to protect the services people rely on but also to have the resources to keep moving on the projects that will serve Limerick for years to come. The progress in this year’s budget booklet shows the benefit to Limerick that those choices made possible.

Economic Backdrop to our tasks today

Limerick is now seeing the advantages of the choices we made.  Despite inflationary pressures, our economy has maintained momentum.  Total employment reached an all-time high in the Mid-West region of 279,000 workers while regional unemployment came in at just 3.4%. 

While preparing for the Ryder Cup in less than a year, we see that construction activity has picked up significantly, most notably and visibly in the progress on the €70 million office building for the OPW which is almost ready for its topping out ceremony, the increasing number of cranes, and the scaffolding on many Georgian buildings and enveloping the main building in the Cleeves centre redevelopment. 

Helped by historically low unemployment rates, despite cost of living pressures, confidence remains high among the public. Increased visitors to the city centre attended the Summer in the City events and over this weekend thousands took to the streets of Limerick for the beginning of the Christmas festivities with thousands spent by capacity crowds during opening night in the Christmas Fayre.  The imagery presented beyond Limerick shows a region on the rise. 

You can also see that confidence on our high streets. Naturally some businesses close especially with our city centre grappling with the same structural issues of cities our size right across the world.  But all the same, we see new businesses opening or existing one investing in their premises, even if their costs are rising and households are watching what they spend.  Public concerns about Bedford Row closures were counter-acted earlier this year by the announcement of a significant expansion of the Savoy Hotel on the street while further down Patrick’s Street another hotel project was announced and planning application submitted to an Bord Pleanala for the hotel on Opera Square.   

Against the backdrop, this year’s budget bears many similarities to last year.  It is why, I am proposing a headline increase of 4% (smaller than last year) in commercial rates.  We have already agreed to keep local property taxes at the same rate as last year. These measures are required to balance the budget which is our obligation. For someone running a shop, a café or a small business, I realise that an increase in rates is another bill to pay. As a result, an increase in small-business relief is proposed to offset in part the impact of the rise for many businesses. 

But when we ask a business to pay more, we cannot take it for granted.  We owe that business three answers. What core services will be protected? What will we improve? What will we change about how we work to make each euro more effective in our hands?

Central government funding is still falling short of what councils need. The Government set out to limit increases in national spending to 6%. Before the recent wage sector agreement, it agreed an increase of €7.1 billion or almost 6% for 2027. However, Limerick’s national allocation of funding such as its share of national Local Property Tax collections was kept at the same level as 2026.  National choices made like this while the cost of basic work like maintaining roads and looking after our streets and public spaces continues to rise has left us with difficult choices today.

Changing how we deliver

But first I want to talk about progress we are making and further plans in changing how we deliver services to ensure that each euro of revenue works as hard as it can.  What I might term delivery through reform. 

We are approaching the halfway point in this Council term. The directly elected mayor role with its associated Mayoral Programme and the Mayoral Fund have set out a new level of ambition for what the Council is being asked to deliver. 

  1. Organisational Development Board: We have made significant progress in changing how we organise that work over the past year, and there is still more to do.   Final decisions for how the organisation is structured remain statutorily the responsibility of the Director General, who is also the Accounting Officer of the organisation.  However, the creation of a new Organisational Development Board to enable dialogue on the main organisational matters on which both myself and the Príomh Comhairleoir sit has added a welcome forum for input from the political side.   
  2. Objective for 2027 in Booklet:  In another change, this year’s budget booklet now sets out what not just what was done in the prior year 2026 (as was the approach in recent years) but sets out too what each part of the Council is aiming to do in 2027. This gives us a new lens through which throughout the year we report on how we are doing in delivering against those objectives and where difficulties arise to discuss where changes need to be made sooner.
  3. New Organisational Structure: I want to thank the Director General who has taken on board some of my proposals for organising the work under my own functions.  The alignment of views between myself, Pat and the leaders of political groupings has certainly helped get any required central government approvals across the line for these changes and I want to thank all who spent time achieving this outcome.  A new single Director of Service now has responsibility for strategic planning and other mayoral functions, the Mayor’s Office and delivery of the Mayoral Programme. Public realm, cleansing and roads are now managed by the same director of service.  A new strategic property management unit to manage acquisitions, disposals and day to day management of owned property (other than for the first year at least active housing) has been established under the Director of Finance who also manages the overall capital budget.  Other changes are also being implemented to strengthen the delivery and management of the Mayoral Programme objectives. We are also putting a clearer focus on who is responsible for work programmes in different parts of Limerick to strengthen the connection between the priorities of councillors from the electoral districts and what is being delivered.
  4. Finance Sub-Committee: This year has seen a new improved level of pre-consultation about the budget being proposed today.  During 2027, I propose to go even further to reform the way we craft and monitor budgets together.  I shall be proposing to the Corporate Policy Group, the establishment of a Finance Sub-Committee to work with me, the Príomh Comhairleoir and members from across the Chamber and the Director General and the Director of Finance during the year to establish other efficiencies in the way we operate, monitor our output and help structure the budget for the following year.   This Finance sub-committee will also work closely with the local government auditor and our own audit committee to improve the monitoring of the performance of the organisation against budget during the year. I intend to propose to the Corporate Policy Group in line with Section 133(4)(a) of the local government act that the Finance Committee will avail of the assistance of not more than three additional persons who are not members of the authority. I propose to allocate funds from the Mayoral Fund to secure the services of at least one person experienced in cost accounting to serve in that respect.
  5. Mayoral Functions: Under Section 149 of the Local Government Act, with respect to my functions, I am responsible for, and I quote, “the efficient and effective operations” the local authority and for that purpose, I am required to “carry on and manage and control generally the administration and business of the authority”.  I propose therefore working with the Finance Committee to focus during 2026 on efficiencies related to the functions within the remit of the Mayor. As proposals emerge, they will also be discussed at the Organisational Development Board to ensure socialization and co-creation with officials.  When changes are identified worthy of being implemented for my functions, I shall invite the Director General to see if those changes might also be replicated those across his own functions too if applicable.  In early discussions with the Director of Finance, I have already identified a number of areas worthy of further investigation in non-essential support functions, non-essential travel not reimbursed by third parties, entertainment where I believe efficiencies can be made.   In circumstances, where particular programmes or services may not be able to transition to full savings in 2026, I am prepared to supplement the budget of some of those areas from the Mayoral Fund to protect core services and help to transition over 2026 to a new cost structure. This funding will be made available provided that a transition plan and related milestones have been agreed and is being implemented.   
  6. The Mayoral Programme Management Office: The Mayoral Programme Management Office has already made significant progress in 2026 and I want to particularly thank Joe Delaney and Rory Corbett for their work there.  This is reflected in the first instance by better control of the Mayoral Fund spending as described below.  Next year we will extend that work to ensure improved planning and tracking of all work across the three pillars of the programme. Subject to final approval by the Department, a new Delivery and Innovation Unit, funded by the Mayoral Fund, will give priority projects dedicated support while ensuring that core services continue.   These projects will for example include review of operating costs and funding of budgetary pressures arising from the running costs and strategic plans of some of our amenities like the Belltable and the Askeaton pool while ensuring that they remain open to the public in 2026.  Decisions about the staffing and allocation of resources in the delivery and innovation unit will be guided by Director of Service responsible for the delivery of the Mayoral Programme.
  7. Mayoral Executive Report: We have also started to improve the information contained in the monthly Mayoral Executive Report. For 2027, we need to make sure the information is disseminated on time and this requires that it comes in regularly to my office, that we automate the reporting where we can and set out results people can easily track. That includes homes handed over, vacant homes returned to use and road works completed. 
    I want these reports to help us answer some simple questions through the year. Where have people moved into new homes? How many council homes are still waiting for work before they can be offered again? Which of the main objectives set out in the budget booklet have been achieved, are on track for timely delivery or are running behind. The budget booklet sets out our current intentions. The reports through the year should help councillors and residents see what has happened since.
  8. Expansion of Discover Limerick DAC Remit: Finally, I have also asked the Director General to review with me to decide whether council-owned companies such as Discover Limerick DAC could make better use of their experience to help us manage tasks before us and facilities or properties we own. Our review will look at how best the Council can support amenities like Lough Gur, Grove Island Sports Complex, the Askeaton Swimming Pool and the Belltable, as well as facilities we are considering acquiring or already advancing, such as the Newcastle West pool, the proposed pool building at Colbert Quarter and the Sailors’ Home. It will also examine how we best support the larger civic festivals and events. I propose that this work is commenced as early as possible as it might also provide ways to ease the pressure on the 2028 budget, or sooner if possible.  I would however point out that the assumption behind this work remains that amenities facing particular running cost challenges in 2026 will remain open to the public.   I also envisage that as soon as we are as has been indicated given the green light by Government to introduce a tourist tax should councillors agree with me then this welcome source of new revenue could then be ring-fenced to support any expanded tourism and amenity role of Discover Limerick.  This will in time allow the current direct subsidy from our operating budget to be further reallocated to essential core services.

I want to thank all of the officials who have worked with me in the run up to today and expressed ongoing willingness to explore what new approaches or ways of working can be adopted so as to continue to show to the public that we are making the best use of our scarce resources.

The Choices we Face

For households listening today, the cost of living is what is left after the bills have been paid. For a shopkeeper, it is whether there is enough coming through the door to pay the staff and keep the lights on. 

The Council is dealing with rising bills of its own, and we have to make choices about how to meet them. 

In this budget proposal, I am asking councillors to look at the proposed rates increase and the extra relief in the context of the services this budget will sustain.

Our budget therefore has three jobs. 

  • The day-to-day budget must protect core services. 
  • Our capital programme must keep investment moving in housing, roads and flood protection, drawing on national and other funding wherever we can. 
  • And I believe it is important that as described we continue to assess how we deliver services and, with pressure to use regular budget to maintain core services, I would like that the Mayoral Fund is retained to help us try new innovations, get additional projects off the ground and improve how we deliver services.

The Mayoral fund also has a role in making capital projects happen. Capital investment matters to the local economy as well as to the people who will use a new road, live in a new home or benefit from flood protection. As national or other funding becomes available, I want us to already have projects far enough along to make use of it. That work takes time, and helping projects get to that point is one of the jobs the Mayoral Fund can do.

I am not proposing specific changes today but it is important to note that we also derive income from other fees or charges on a daily basis.  I have asked the Director of Finance to specifically prepare a report for me in the first part of 2027 which will compare for me our parking charges with those in similar areas in Ireland and consider if increased fees could be ring-fenced for road or public realm maintenance or the provision of additional parking facilities across the county.  If the results are positive, I plan to bring that work to the relevant Strategic Policy Committee to help agree further steps. Even a change intended merely to keep pace with inflation has consequences which must be carefully considered. We need for example to understand what it would mean for businesses that depend on people coming into the city or town centres.

Protecting the services people rely on

I think we all agree in this room that a key priority for today is protecting the core services on which people rely daily. 

Accordingly, the proposed budget spending on services for Limerick is set to rise from €301 million to €320 million. 

The headline budget actually falls from €940 million to €908 million. But the main reason is that spending through the Housing Assistance Payment Shared Services Centre falls from €640 million to €587 million on the figures in the draft. 

Three increases matter particularly to residents and so are proposed for approval. The proposed Housing and Building budget rises by 12.2% to €110 million. Roads spending rises by 7% to €63 million. Recreation and Amenity spending rises by 2.4% to €22 million.

Last year I promised to do more so that our budgetary process became more collaborative than was possible in earlier years.  This year, councillors received the draft one week earlier than last year. That gave us time for three special meetings of the Corporate Policy Group, three full Council workshops or meetings, including the one that set the Local Property Tax rate, and discussions with councillors from all political groupings.  I want to thank our Finance Directorate for getting the figures to us sooner and supporting those discussions.

There were also numerous meetings between individual political groupings, Council officials and myself. The benefit of those conversations is that we come to this meeting this year with a clearer idea of what councillors across the chamber want to protect and where there was room to move. The budget before us today reflect those discussions.

This is how I want us to increasingly draw up our budgets. Councillors have different priorities to each bring to the table, and extra time with the figures means we can better understand the choices and find areas of agreement. 

This year a particular concern raised was the rising cost of looking after our roads and public spaces. Councillors hear concerns about it from people in towns, villages and city neighbourhoods throughout the year.  Others were anxious to ensure that the extra focus on voids can continue into 2027.

As an outcome of our recent deliberations and to deal with concerns raised, I have circulated for consideration today the details of an amendment to the proposed budget. This offers an extra €1 million for roads and public realm maintenance financed by several other adjustments.  We know that this is important because people need roads they can rely on every day. The specific terms of the amendment and how it is financed have been circulated. 

I would be happy with this amendment if it is welcomed by the Council not least as the extra funding will also help us present Limerick well when we welcome visitors for the Ryder Cup.

Housing comes first

Like you all, I hear every day the hardships caused by the current housing emergency and this remains a key priority.

We need to build more homes, bring empty homes back into use and make it possible for more people to rent or buy at a price they can afford. The Council has a part to play in all three.

The Government’s combined build target for social and affordable housing in Limerick in 2027 is 764 homes. We now have specific projects in the pipeline for 878 units. Some will still face hurdles. The test for 2027 is how many of those homes we get built and handed over. Our aim has been since my election to exceed the Government’s target next year and in the years that follow.

We went into 2025 and 2026 with too few projects advanced far enough along to meet even the Department’s targets. That deficiency still shows up in the numbers of homes we are delivering today. Over the past year, our housing team has worked hard to turn that around.  Across 2027 to 2029, the pipeline now stands at 2,205 social homes and 1,885 affordable homes for purchase or rent.

We already have another 1,217 affordable homes in the pipeline for 2030 (four years from now). This shows considerable progress as, at this point last year, we had only identified 398 for 2029, which was the equivalent year four years into the future in the comparison. 

When people hear that a housing project is in the pipeline, they quite reasonably ask when someone will be able to move in. It is some comfort that these are not just numbers on a spreadsheet.  At this stage, our housing team can point to named projects and the years in which we expect them to come through.  This was acknowledged and welcomed in my recent Ministerial Forum meeting.  But issues could arise to hold up delivery.  We now have to keep working to minimise those risks. Increasing the number of homes we can realistically bring forward is work the Council, Limerick Twenty Thirty (to whom I am giving an increasingly important role in housing delivery) and the Land Development Agency need to do together.

We still have ground to make up.  Our record for public housing delivery remains among the most challenged of Ireland’s 31 Local authorities.  Overall, the government wants to see just over 2,500 homes delivered annually in Limerick over the next period of some 10 years. I have asked our housing team and the Land Development Agency to do more.  We are jointly targeting 4,000 homes on average across the private and public sector in the next six years and developing a more detailed plan for the delivery of these. The sooner those homes become available, the sooner we can begin to ease the pressure people face when they go looking for somewhere to rent or buy.

Page 33 of the booklet shows a pipeline of 1,383 starter homes for purchase through to 2030. Fewer than 100 are in the pipeline for 2027, which reflects how few of these projects were already far enough advanced going into 2025. Of the 1,383, 608 are now in Limerick City West and 193 in Limerick City North. In the past five years, just 41 affordable homes for purchase were delivered across Limerick, and none of them were in City North or City West. Those areas need to see the benefit of the bigger programme now taking shape with projects like Mungret finally on site to deliver over 180 starter homes.

More rental choices in Abbeyfeale and Mungret

In Abbeyfeale, with our new project six homes are almost ready to rent. This is our pilot for people who struggle to find a home they can afford and fall outside existing housing supports. The rental model is designed to cover its costs. There were doubts in this chamber about whether the Government would agree to the approach. It has now agreed both that the Council can reinvest the proceeds from the sale of the homes in more properties and that I can use the Mayoral Fund to finance Limerick Twenty Thirty’s purchase deposit.  This is tremendously welcome news and an outcome of our decision to push forward with getting the homes ready using the Mayoral Fund while government discussions continued in parallel. 

In Abbeyfeale, €400,000 from the Mayoral Fund is helping to unlock around €1.2 million of investment in homes. That is the value of structuring the investment carefully. A limited budget can do more when this happens, and I welcome the Government’s agreement to our innovation.

We can now look at doing this again in Abbeyfeale, in other towns and in the city. We have already moved ahead with two more city properties. The approach makes particular sense where an area has already exceeded its social housing targets or where homes are attracting few buyers. The Mayoral Fund financed the purchase of those two additional properties. Their value can next support borrowing by Limerick Twenty Thirty to refurbish them and potentially buy even more. Over time, a mixed portfolio could give us scope to raise further finance where Government funding is unavailable or insufficient to meet demand.

There is an important market dynamic at play here. When investors expect rents to keep rising, that affects how much they are willing to bid for existing homes. More rental supply, on sufficient scale and over time, can ease that rental pressure and in turn reduce what investors will pay when bidding to buy existing properties. That matters to people competing to buy a second-hand home who get little or no benefit from existing subsidies.

Of course, we also need affordable homes to buy, including new starter homes and are working on those. But, the Abbeyfeale pilot addresses a different part of the problem.  Six homes will not solve the problem but it will give us a chance to see how this approach works in practice and what would be involved in using it more widely.

In parallel, we are advancing the pathfinder for 120 SMART homes in Mungret. That applies a similar idea on a larger scale but through new construction, creating more rental options for people caught between the housing supports available and the rents they are being asked to pay.

Bringing empty council homes back into use

Every council home we bring back into use is a home someone can move into. In a housing crisis, the time it spends empty matters. For several years we were returning only around 70 homes a year after tenants handed back the keys. Last year we stepped up redelivery to 129 homes.  In earlier years, the Local Government Auditor drew attention to the slow average turnaround time when reviewing the 2023 accounts.

For this year, I directed proceeds from the sale of certain non-core capital assets and other capital resources be directed to finance the capital works.  In the amendment suggestion I have circulated, you will see I am also directing adjustments to capital reserves so that the Housing Directorate has funds to hire and fund additional direct labour crew for the tasks ahead. There has been notable success, the average time has fallen from 55 weeks to 37 weeks, and we are on track to return 145 homes to use this year.

When a tenant hands the keys back, we need to assess what work the home requires, get a crew in and have it ready for the next household. We took two steps last year to make that happen faster. We freed up the money for the work and authorised another direct labour team to do it. This year we will keep pressure on to do even more. 

We will use capital funding again in 2027 to keep the work going. But we also need a more reliable way to fund it in the years ahead and the development of that plan should not wait until this time next year.

Helping people out of homelessness

Our homeless services team works with other agencies and approved housing bodies to help people through some of the hardest periods of their lives. I have provided for expected demand in 2027. The cost is projected to rise to €27.8 million. Central government reimburses 90%, leaving a substantial cost for the Council.

We need to help more people into long-term homes and make better use of the money we spend on emergency provision. With demand appearing to level out, I believe that there is now an opportunity to reduce the quantum and cost of our reliance on private sector providers to cope with the demand on our services. I have therefore asked the Director General to review and, where possible, renegotiate contracts with private providers in 2027. The aim is to reduce the average cost per case by 15%, with service quality part of that review and savings feeding into Budget 2028.

The reason for looking at both the contracts and the longer-term options is that the choices we make now will shape what we can afford in later budgets. Each year that we rely heavily on private provision, a substantial part of our spending goes on accommodation that we do not own but have to pay for again the following year. 

I have also asked Sarah Beasley, my co-chair of the Expert Group on Homelessness, to recommend how we can secure capital funding from the Department of Housing to buy or build more suitable long-term housing of our own. I would like the Housing Strategic Policy Committee to also take that up in its work programme. We should learn from approaches tried in other cities. Building up housing we can use over the long term would reduce our dependence on private accommodation and create assets the public can keep. I plan to make provision through the Mayoral Fund through the new Delivery and Innovation Unit for the expertise this work will need.

Capital investment across Limerick

Under government guidelines, Limerick is to plan for a population growth of around 50% over its current population numbers.   That means major investment in transport, healthcare, water and other infrastructure. Much of that work sits outside the Council’s budget, but it matters to the people we serve.

Last year, I identified a number of projects I thought were key ones where progress was needed in 2026.

The proposed operating budget supports our continued work to keep pressure up on delivery through the Limerick Project Ireland 2040 Delivery Board, which I chair, and the Limerick Mayoral Advisory and Implementation Committee chaired by the Minister for Housing.

I think it is important to record a number of notable successes for Limerick in the past year when it comes to capital projects.  Sometimes we can miss the very things that are happening in front of our eyes.  I think the council, the Government and officials in our local authority and other agencies deserve much credit for the work that has been done.  There is a lot more happening outside of this list but I for now will focus on projects I identified last year as being worthy of attention.

  • The surgical centre at Punches Cross and 100 additional beds at University Hospital Limerick were health priorities. Both have moved forward. 
  • Consultants have also been appointed for the rail project to Limerick Junction, with a planning application envisaged for 2027. 
  • The Adare bypass is progressing well towards its Ryder Cup deadline, and trains are already testing the line to Foynes. 
  • On King’s Island, flood protection works are moving ahead and the community centre has secured Part 8 planning approval. For 2027, the priorities include appointing the contractor for the centre and improving the greening of the public spaces around the Council offices at Merchants Quay.
  • Work has started on the South Circular Road active travel scheme. 
  • We expect to submit final planning documents for University Way in 2027. 
  • At Arthur’s Quay the Tourist Office will shortly be ready for long-term occupation. 
  • On Nicholas Street, works have started on the Forge Design building.

These projects are all at different stages. As further milestones are reached (or even if missed) I want us to keep reporting as the year goes on.

In Patrickswell we will keep working on the masterplan for the land we acquired for housing. 

In the Colbert Quarter project, our new delivery governance structures are kicking into gear.  The 2027 priority is advancing the planning applications for Colbert Park and the surrounding housing and advancing planning for the new sports centre and related outdoor public amenities .  The Mayoral Fund and the Land Development Agency are providing most of the funding for this work.

The Georgian Quarter and Opera Square

People should keep seeing changes on the ground while we prepare the larger projects. Across our county projects have been delivered like the new road to the parking area in Abbeyfeale, projects all along the Greenway and progress getting ready to deliver the new fire station in Cappamore. 

We have also made good initial progress on greening Georgian Limerick. The Mayoral Fund paid for the land for the Wickham Street pocket park, and initial works there have gone ahead alongside works across the junction at Parnell Street.  Both should move to completion in 2027.

Consultation on the transport and public realm strategies is complete, and we expect to finalise them in 2027. The emerging ideas give us a chance to take forward ideas such as a new urban park on Lower Glentworth Street.  We also want to investigate advancing some of the works on Cruises Street.  Where we can improve a street now, let’s get on with it. Where we need design, consultation or funding, let’s do the work early so we are ready when the opportunity comes. 

Opera Square needs another year of sustained attention. Opera One is fully built but needs to move towards occupation now as empty buildings do not generate valuable rental income. The OPW building and the Granary are progressing quickly.  National funding for Bank Place and the Granary Courtyard now allows us to advance public spaces that will connect Opera Square to the streets around it. I also want Limerick Twenty Thirty to pursue funding and begin work on the Georgian residential refurbishments along Patrick Street in 2027. The €60 million Renovation for Cost Rental Scheme is one possible source of funding.  Planning permission has been lodged for the hotel project. 

My ambition has always been to see every part of Opera Square delivered. Next year we need to push ahead with every element we can. I am worried that we still have no clarity from the Government how and where they would see us being able to fund the new civic library, and I want our national representatives to help us make that case together.

A library is one of the few places in a city where you can walk in, sit down, study or bring a child without having to buy anything. That is exactly the kind of public space we need at the heart of Opera Square.

Whether you come in from Patrick Street or walk up from the river, it should feel like a part of Limerick that belongs to you.

How we are funding the capital programme

I want to discuss the important issue of how we fund the capital programme. We have proposed much needed investment in Limerick for 2027 of €696 million. This is subject to funding being available.

The Mayoral Fund has helped a little and allowed us to move ahead on the Theatre Royal and adjacent Athenaeum, the Sailors’ Home, the housing lands at Patrickswell, greening in the Georgian Quarter, the Mary Street Fashion Incubator site and the public viewing garden at Curragower. But in scale it is a drop in the ocean against what is needed. The programme  depends on winning money from other sources.  I want to explain what we are doing in that respect.

Early in the term, some councillors questioned how the Mayoral Fund could stretch to cover the ambitions in the Mayoral Programme, and suggesting cutting back the projects in the Programme to only those capable of being funded by the Fund.  At the time, I did not agree as I felt it was critical to have a coherent plan for all Limerick needed. 

The funding we secured this year shows how important elements of the programme can be financed other than from the Mayoral Fund and retain its higher ambition. The Fund can help us buy a site or do the work needed to get a project ready. And once a project is ready, we can continue to compete for larger awards, as we are doing well now, that can pay for construction or the infrastructure needed to unlock housing.

€6.5 million of European funding has been secured for the Forge through THRIVE. Through the Towns and Cities Regeneration Investment Fund, six projects secured €22 million of funding support, including €9 million for the Nicholas Street public realm and €7.5 million for the central plaza at Opera Square and €6 million to open up Toppins Field for housing. 

We also secured around €50 million in competitive housing infrastructure funding, including €20 million for Colbert Park and related sustainable drainage, €10 million to €20 million for the Castletroy Link Road and €10 million for transport infrastructure in Mungret. This HIIF funding will enable the direct delivery of circa 3,800 homes across five key sites and provide the potential for more than 6,800 more homes. 

A further €90 million has been recently announced by the government for relocating existing operations in Galway and Limerick to free up lands for housing. This will fund movements of existing HSE operations and sporting grounds in Cals Park, freeing up land for housing in our own Colbert Quarter. Progressing these projects will be a priority in 2027 for the Council and, where involved, the Land Development Agency.

The Mayoral Fund

Last year’s agreement to meet the 2026 CCTV cost was accompanied by a significant carryover into 2026 and an increase in the annual Mayoral Fund from €7 million to €8 million. Together, that gave us €14.089 million for Limerick projects this year.

Some councillors were concerned a short time ago that we might struggle to spend even €7 million. I was asked late last week to reallocate a small percentage of several hundred euros which I am in the process of doing and so we remain on schedule to use the full allocation by the end of November. 

In early December I intend to report on all of the projects funded in 2026 and on expected allocations for 2027 once the Department confirms the amount available. I have set out the risks to Limerick if the amount falls. Page 13 of the draft budget shows how some of the day-to-day allocation could be used if as expected it amounts to €2 million. That spend includes improving festivals and events in 2027 where the regular budget cannot absorb increases to cover more ambitious plans.

What people should see in 2027

We are asking businesses to pay more and asking residents to pay local property tax and other fees.  They are entitled to see what that delivers and how we are striving to deliver it as efficiently as possible. 

In 2027 I want us to be able to point to homes with people living in them, roads we have repaired and public spaces people are using. Where we fall behind, we should say so and explain what we’re doing about it.

That is the standard I ask us to set for this budget and to hold ourselves to in the year ahead. 

I remain very optimistic that the future is bright for Limerick. 2027 should be another great year of progress in our objectives.

I want to take the opportunity to thank the Director General and all of the administration for their dedication and hard work during 2026.  I would also like to acknowledge the support I have received from the Council Chamber especially in the crafting of this budget which I propose to you today.

Ní neart go cur le chéile. Sin é an ceacht a d'fhoghlaimíomar i mbliana, agus sin é an bealach chun tosaigh do Luimneach. Go raibh míle maith agaibh." ("There is no strength without working together. That is the lesson we learned this year, and it is the way forward for Limerick. Thank you very much.")

John A Moran

Limerick 24/11/2026

See More